
Planking
Epoxy glued and stainless ring-shank nailed to stringers - Screwed & epoxyed at the stem and stern post. Two layers of 10mm on the topsides and two 10mm’s + 6mm on the bottom. All the ply is scarfed and epoxy sandwiched together. This part of the job consumed a shed load of epoxy (West system) but had made a solid job.
painting and epoxy - glass cloth/peel ply . Sticky messy job. The whole hull covered with 200g glass cloth set in epoxy.
two pack primer