After a Shed warming party, mid december, I started to loft the boat full size on three sheets of hardboard on the floor. This was easy as being a dory the boat has a flat bottom and straight sides. I drew out the twelve ‘stations’ that give cross sections through the boat roughly every 800mm down the length of the boat.. These become the molds forming the shape of the boat. The pictures describe this better!
After the weeks worth of Christmas and New year celebrations and headaches that follow I started constructing the male molds. I made these using 6x3/4” flooring that didn't ‘make the grade’ from a local sawmill. By simply laying them down and screwing them together on the drawing gave accurate and quick results.
No comments:
Post a Comment