






I decided that it would be great to get the deck on before christmas so that we could have a 'christmas party' in the boat. Laminating all the deck beams took some time - the knees have 9 laminates each and main beams have 6. All epoxy glued together. 

Main mast partners . This component holds the mast up so has to be strong.
3x layers of half inch ply followed by the deck (2xlayers 3/8”) Because of the raised deck this over nine foot long by two foot wide making it quite heavy to handle on your own! I thought about making a mould to laminate it over but concluded that it would consume too many materials. It turned out easy enough to mold it in pisition on the boat. Starting with scarfing the ply to make three 10’x 2’ sections. I put one of these in position on the boat and then spent some hours putting props under it from the cabin floor/galley units/water tanks pushing it up into a smooth curve that i was happy with. It looked quite a lash up but worked well. Once the props were in i took the ply off and added a mass of epoxy to create the usual sticky laminate sandwich and clamped into place.



At last the cabin sides are now finished and the boat is really showing her shape now. It is amazing how different she looks with the sweeping cockpit sides that are mirrored at the bow.
To get this shape I started by making a hardboard template to get the shape right without committing to expensive ply. I then scarfed together two 8’ lengths of ply to get a 16’ section that would bend and twist around the cockpit in one hit (it makes the transition from leaning into the cabin to leaning out to match the hull angle at the stern post/stem while curving around the cockpit/bow) These are then screwed, glued, nailed and tortured into position followed by a second layer. At the same time I used 100mm glass tape and epoxy to smooth in the joint between deck and side.





I am now fitting the cabin sides and working towards fitting the main deck. The basic interior and all the large fittings including engine and tanks (water and diesel) are installed as once the deck is on they will not come out again. (engine will squezzz out of the main hatch). A few photos:
Charlotte’s painting the areas that the tanks get fitted into and the first ply layers of the side decks are in place.

I made the tanks from 2.5 mm 316 stainless steel. I needed three sheets (8x4) to make the 4 tanks.
Two 20 gallon fuel tanks (40 Total) and two 60 gallon (120 total) tanks for fresh water.
I used a plasma cutter (thanks John) to blast out all the flat sheets. this was qui
ck and easy as you can use a straight edge (10mm ply) clamped down the the sheet metal and just run the cutting head down this. Far easier than angle grinding! I then use flap disks in a 4”grinder to remove what little slag is left from the cut. I had cut out all the sides in an afternoon. Then it was just a case of tacking all the sides together every 6 inches or so before seam welding it all together using a TIG welder. I added stiffening bars in the middle of the sides to prevent the sides bulging out when full of water/diesel.
I made 10 inch inspection hatches on the tops of all the tanks . Adding these and all the pick up pipes / fillers seemed to take longer than making the main tanks. In all these tanks took me 8 days to make which i think has been well worth while at this stage.
